Registry Documents

All M-RETS program documents such as the Operating Procedures, Terms of Use, Fee Schedule, etc. can be downloaded below.

Renewable Electricity System Registry Documents

Operating Procedures

M-RETS® REC Operating Procedures

Summary of Operating Procedure Changes (02/16/2024)

M-RETS® Variance Request Checklist

M-RETS® Variance Request Form

 

Generator Registration Documents

Schedule A: Designation of Responsible Party

Schedule C: Declaration of Agency

MISO Generator Data Release Form

SPP Generator Data Release Form

Green-e Energy Designation for Generator Accounts

Facilities registered in CA will only be approved as CRS listed with the status “Approved – Requires Additional Green-e® Verification”. Supply from such facilities may not satisfy Green-e® certification requirements without such additional steps, such as procurement of allowances or retirement allowance. For more information, please contact CRS at [email protected]

Distributed Generation Groups (DGGs) Units Upload File 

Distributed Generation Groups (DGGs) Registration Instructions

 

Generation Data

Hourly Sample Upload Template

Monthly Sample Upload Template

Generation Adjustments

Mass Certificate Transfers 

Mass Certificate Transfers Template

 

Renewable Thermal System Registry Documents

 

Operating Procedures

M-RETS® Renewable Thermal Operating Procedures

M-RETS® Variance Request Checklist

M-RETS® Variance Request Form

 

Generator Registration Documents

Schedule A: Designation of Responsible Party RTC

General RTC Registration Guide

M-RETS RTC Registration Guide for Oregon DEQ Clean Fuels Program

M-RETS RTC Registration Guide for Washington ECY Clean Fuel Standard

M-RETS RTC Engineering Documentation Requirements 

M-RETS RTC Generator Public Report

 

Other Documents

M-RETS® Fuel Types Appendix B-4

Nomination Policy

NC-RETS Import Attestation Form

WI Three-year Hydro Average Fact Sheet 

 

Terms of Use

 

2018 Changes